Category: Greenway Project Progress

  • Dream With Us

    Dream With Us

    The Southeast Greenway will take shape through a series of planning and design phases, each building on the decisions of the last, adding detail until the design is ready to build. A useful way to picture it: the project starts as a vision on a map and ends as drawings and instructions a contractor can build from. 

    We are currently in the Master Planning or “Dream It Phase,” composed of three steps: Discovery, Exploration, and Synthesis. Throughout this phase, we will collect and analyze information about the site, gather community feedback and programming ideas, and create a Master Plan for the entire Greenway. 

    Master planning is the big-picture framework for the entire corridor. It establishes the vision and goals for the Greenway and the physical organization of the site—the alignment of trails and how they connect, where habitat, open space, recreation and gathering places sit in relation to neighborhoods, and how the land works at the scale of these relationships. The approved Master Plan becomes the basis for the technical design that will then be done for construction of the Greenway project components.

    Community engagement timeline

    The phases in this part of the process include: 

    • Community Engagement: Through all planning phases to gather the community’s dreams and priorities and include public workshops, a Community Design Council, arts-based engagement, pop-ups in all four quadrants of Santa Rosa, and materials in English and Spanish.  

    • Phase 1 Discovery: A thorough assessment of existing conditions—ecological features, creek corridors, transportation networks, utilities, topography, floodplains, biological and cultural resources, and the social fabric surrounding the Greenway. This early research work means all ideas are tested against real site information from the beginning.   

    • Phase 2 Exploration or Concept Alternatives: The design team develops 2–3 distinct concept alternatives reflecting the community’s needs and aspirations. These are the dreams and ideas stage: what amenities and features will the Greenway include, generally where will they go, how big they will be, and how do they relate to one another. Each alternative is evaluated for feasibility, cost, and alignment with community goals. 

    • Phase 3 Synthesis or Preferred Concept: Through iterative feedback with the community, a preferred concept is selected and refined, with park amenities and elements, circulation, habitat areas, preliminary grading, and gathering spaces refined together. 

    Master planning concludes with the Preferred Master Plan: illustrative plans, diagrams, and graphics inspiring excitement and philanthropy, along with a statement of probable costs and an implementation strategy covering funding, phasing, governance, and stewardship. The implementation strategy identifies early-action and pilot projects, or the natural candidates, for a First Phase Project when design work resumes. 

    After the Dream It Phase concludes, the Technical Design Phases or the Build it Phase, begins. Over the next year and a half, we will complete the Master Planning and Community Engagement phase—laying the foundation for a greenway shaped by the dreams of Santa Rosa’s residents. From there, the pace of the technical design phases will follow the community’s vision and the funding we secure together, carrying the newly envisioned Greenway from plan to reality. 

    We look forward to seeing what our dreams entail.  

  • Launch of Master Planning and Community Engagement Process

    Launch of Master Planning and Community Engagement Process

    Some of the best things in a community begin with a simple idea: what if? 

    What if this long-vacant corridor became a place filled with laughter, connection, nature, and joy? What if it became a place where neighbors greet one another on a morning walk, kids discover new adventures, families gather for picnics, and friends meet up for a bike ride or sunset stroll? 

    For years, community members have carried that vision forward. What started as a grassroots effort has grown into a shared undertaking fueled by neighbors, volunteers, community organizations, public agencies, and local leaders working together to create something special. Now, we’re excited to begin the next chapter. 

    The Southeast Greenway is more than a park project. It’s a chance to create something extraordinary together. 

    City of Santa Rosa, in partnership with Sonoma Land Trust, Greenway volunteers, and community partners, is launching the master planning process for the Southeast Greenway that will transform the two-mile corridor of vacant land into 47 acres of park amenities, trails, natural open spaces, and community gathering places that community members across Santa Rosa can enjoy. 

    But here’s the most exciting part: the Greenway isn’t being created for the community. It’s being created with the community. 

    The ideas, stories, and dreams of Santa Rosa residents will help shape what comes next. Whether you’ve been involved for years or are just hearing about the project today, there’s a place for your voice in this process. 

    We invite you to be part of this exciting next chapter. Fill out our community survey, attend a community workshop this November, or come see us at community events this fall. Your voice will help shape a park that serves all of Santa Rosa and future generations. 

    Together, we will create a park that reflects the city’s diverse communities, celebrates local culture and creativity, and advances equity, inclusion, and connection. We hope you’ll join us, bring your friends and neighbors, and help spread the word.  

    As we like to say, we’re on the path together. 

    Thank you for being part of this journey. We can’t wait to see what we’ll create together. 

  • Meet the Community Engagement Teams

    Meet the Community Engagement Teams

    Community involvement is an important part of the Southeast Greenway’s planning process. As we move into the next chapter of creating a park for the community, with community input, we’re excited to be working with a number of organizations on outreach. These organizations will help us reach different community members across Santa Rosa and Sonoma County for input into the future Southeast Greenway park.   
     
    Civic Edge Consulting – They led outreach and engagement in Sonoma County supporting projects related to transportation, housing policy, and wildfire resilience. As a women-owned, employee-led firm, they focus on empowering communities through authentic community engagement and responsive communications towards the public. 

    Kimzin Creative – Believing joyful futures are created by, for, and with community, they will lead creative and arts-based engagement for the Southeast Greenway master planning process using the arts to unleash the creative capacity of Santa Rosa’s diverse communities and inform the design, programs, and operations of the new 47-acre park. Their work creates welcoming spaces where communities historically excluded from placemaking can come together to dream, imagine, and shape what’s possible. As a Petaluma-based arts and equity consulting group, with recent contributions to Santa Rosa’s General Plan Update, Kimzin Creative brings trusted relationships and deep knowledge of the region’s vibrant communities to the project. 

    Latino Service Providers (LSP) – Serving as a bridge across generations in the Latinx community and working to improve access to healthcare, mental health services, education, legal support, and other social services, LSP will be helping with connecting the Latinx community during the next phase of the Greenway project. They will be conducting outreach activities such as tabling at open houses and other events to reach Spanish speaking neighbors near the Greenway, and across Santa Rosa.  

     We’re excited to be partnering with these organizations to engage with the diverse communities living within Santa Rosa and Sonoma County! 

  • Southeast Greenway’s New Look

    Southeast Greenway’s New Look

    As we officially launch the master planning process, the Southeast Greenway is entering an exciting new chapter—and we have a new look to support our community-led planning process! 

    Inspired by the corridor’s natural beauty and future potential, the new logo features rolling hills, a winding pathway, and native wildflowers that symbolize connection, movement, environmental stewardship, and the relationship between people and nature.  

    The refreshed identity reflects the community’s vision for a vibrant, accessible greenway while our new website provides a welcoming hub for project information, events, engagement opportunities, and ways to help shape the future of this once-in-a-generation park.

  • Successful Summer Appeal

    Successful Summer Appeal

    Thank you for your support

    • Inclusive Outreach: Reaching neighbors and residents across Santa Rosa to ensure all voices are heard.   
    • Events & Engagement: Hosting walks, open houses, and interactive workshops to weigh in on the design.   
    • Volunteer Coordination: Empowering the people-powered engine driving this campaign.  
    • Grant Matching Leverage: Multiplying your impact to unlock critical federal, state, and foundation funds. 

    Working together, we’re ensuring the City of Santa Rosa’s newest park is being built by the community for the community. Thank you!

  • Sharing Dreams for the Greenway

    Sharing Dreams for the Greenway

    Volunteers Worked Together to Envision a Completed Park

    After years of advocating for the Santa Rosa Southeast Greenway park land, volunteers gathered together to write down their dreams for park amenities onto sticky notes. The notes were then placed in recommended areas on a map of the greenway. This was an important step in maintaining the ideas and input received by volunteers and community members over the years as the Southeast Greenway moves into the next phase of planning.  

    In early July, Southeast Greenway volunteers and supporters gathered once again to share their dreams for the park, now with renewed energy as CMG Landscape Architecture has joined the project to help design the park’s master plan. Long time volunteer Pete Dellavalle presented possible recreational uses and their locations such as a pump track, adaptive playgrounds, yoga area, and more.  

    Attendees also met representatives from CMG Landscape Architecture, who the City of Santa Rosa recently hired to help design the master plan for the park, and Civic Edge Consulting, who will help with community engagement and outreach. CMG Landscape shared more about their work and how they plan to integrate and restore natural features along the Greenway as part of their plans for including trails, habitat spaces, and recreational areas. It was exciting to see how even with new organizations involved, the focus is on making sure the Southeast Greenway is going to be a park built by the community, for the community.  

    Special thanks to Sonoma Clean Power for hosting the gathering at their downtown Santa Rosa headquarters and Santa Rosa City Mayor Mark Stapp for attending.

    If you have dreams for this park, stay tuned for upcoming workshops, surveys, and more.  

  • City Selects Master Plan Consultant

    City Selects Master Plan Consultant

    A Major Milestone in Bringing Santa Rosa’s Newest Park to Life!

    After months of anticipation, the Santa Rosa City Council has taken a major step forward for the Southeast Greenway. On June 16, 2026, the Council approved a contract with CMG Landscape Architecture to lead the master planning process for the nearly two-mile corridor connecting Farmers Lane to Spring Lake.

    This marks the official start of the next chapter for the Greenway: planning the transformation of 49 acres once slated for freeway expansion into a vibrant, welcoming public park in the heart of our city.

    CMG brings deep experience shaping public spaces across the Bay Area. The San Francisco-based firm led the landscape design for the Petaluma River Park project, which will become a destination park. They designed Mission Rock, the waterfront neighborhood near Oracle Park developed in partnership with the San Francisco Giants, and played a leading role in long-term planning for Crissy Field, one of the most visited and beloved parks in the region. Their portfolio also includes major civic and waterfront resilience projects throughout Northern California—work that should translate well to a community-defining space like the Southeast Greenway.

    According to the City of Santa Rosa’s announcement, community outreach will begin soon, giving residents a chance to help shape a shared vision for the park. Input gathered from participants will inform a draft master plan, expected to be ready for public review in spring or summer 2027.

    This is wonderful news, and a strong signal that real progress is finally underway. As outreach plans take shape over the coming weeks, we’ll be right here to help spread the word.

    Stay connected with us for upcoming opportunities to get involved and make your voice heard as planning begins.

  • What’s New on the Greenway

    What’s New on the Greenway

    Learning More About Environmental Conditions in our Newest Park

    Have you noticed the new split rail fencing that borders one section of the Southeast Greenway along Summerfield Drive? Thanks to the Santa Rosa City staff who built it to keep our shared spaces looking great.

    There’s more that’s new on the property. As we look forward to the launch of the Southeast Greenway Master Planning process later this year, we’re excited to share two new efforts to better understand current environmental conditions along the corridor: the installation of an air quality sensor and a wildlife camera.

    Graphic showing Purple Air sensor readings on the Southeast GreenwayNew Air Quality Sensor Provides Baseline Data
    Sonoma Land Trust recently installed a weather and air quality monitoring station along the Southeast Greenway near Yulupa Cohousing. One of its main goals is to collect baseline environmental data before major improvements are made to the site. Getting a snapshot of current conditions like temperature patterns and air quality levels will help project partners compare conditions after restoration and park development.

    This is especially valuable because the Southeast Greenway passes through areas affected by common urban environmental challenges: heat islands created by paved surfaces, limited tree canopy, and nearby traffic corridors including Highway 12. As the Greenway develops into a park with restored creeks, expanded vegetation, and new public spaces, these improvements may help moderate temperatures, improve air quality, and make nearby neighborhoods more comfortable and resilient.

    PurpleAir: A Citizen Science Network
    The new monitor is part of the PurpleAir network, a citizen science platform where individuals and organizations install air quality sensors and share their data publicly. PurpleAir sensors measure fine particulate pollution (PM2.5), an important indicator of air quality and potential health impacts. Data is uploaded continuously and displayed on an online map where anyone can view local conditions. You can find the Southeast Greenway’s monitor listed on the network as “YulupaCoHousingSensor.”

    By collecting data now and continuing to monitor as planning moves forward, the project team hopes to document how the Southeast Greenway improves the surrounding environment over time.

    Wildlife Camera
    A Southeast Greenway Campaign volunteer recently installed a wildlife camera on the property to learn more about which species are moving on and through the corridor. In the short time the camera has been in place, it has already recorded visits by deer, skunks, coyotes, grey foxes, wild turkeys, raccoons, and jackrabbits.

    Daytime image of wild turkey from wildlife camera on Southeast Greenway Night time image of coyote from wildlife camera on Southeast Greenway

    The air quality and wildlife information collected with these new tools will help inform the Master Planning process, along with community input and other sources of information. Watch for updates on what we’re learning from these tools in future newsletters.

    [/fusion_text][/fusion_builder_column][/fusion_builder_row][/fusion_builder_container]

  • City Issues RFP for Master Plan

    City Issues RFP for Master Plan

    The Southeast Greenway Moves From Vision to Planning

    We’re excited to share a major milestone in the journey of the Southeast Greenway: the City of Santa Rosa has issued a Request for Proposals (RFP) for a consulting team to develop the park’s Master Plan. This is a big step forward in shaping the future of this 2-mile urban greenway that will connect Farmers Lane to Spring Lake and serve as a key corridor for walking, biking, nature, and community life in our city. 

    What is an RFP?

    An RFP, or Request for Proposal, is how a public agency like the City asks qualified consulting firms to submit ideas and plans for a project — in this case, the Greenway’s Master Plan. It’s the first key step toward choosing a team that will help guide how the park will be designed and developed over time. 

    What will the Master Plan do?

    A Master Plan is a big-picture roadmap: it will gather community input, describe priorities for trails, open space, habitat restoration, and amenities, and recommend how the Greenway can support safe, active transportation and welcoming public space for all. It will help guide the many decisions that come next — from how paths are aligned to where picnic spots or gardens might go — while balancing access, recreation, ecological restoration, and long-term sustainability. 

    How will the Community be Involved?

    Responses to the RFP are due to the City by February 19, 2026. Consultant interviews are anticipated in March, with contract approval by the Santa Rosa City Council in May 2026. Provided there are no major delays in the consultant selection process, community outreach and engagement to inform the plan is expected to begin in July 2026 and continue through the spring of 2027.

    This marks the start of an exciting phase where community voices will help shape the Greenway’s future. We expect this planning process to unfold over the next couple of years, and we will share ways for everyone to get involved as they arise. Stay tuned!

    Photo: City prepares for Master Plan by marking property boundaries along the Southeast Greenway.

  • Support the Southeast Greenway

    Support the Southeast Greenway

    Your Donation Makes a Difference

    For years, our Campaign worked to bring the Southeast Greenway into public hands, and we did it! Now we’ve reached a pivotal moment as we shift from land acquisition to actively engaging our community and planning a new Santa Rosa park.

    Working with the City of Santa Rosa and Sonoma Land Trust, we’ll create a park that restores natural areas, supports climate resilience, and welcomes people of all ages to walk, bike, play, learn, and connect. 

    To bring this vision to life, we’re asking for your help once again. Donations will help:

    • Launch the Park Master Planning process; 
    • Support public outreach and community engagement;
    • Build strong partnerships that help care for the land long-term;
    • Leverage private gifts to unlock crucial matching grants;
    • Provide interim activities to keep the Greenway safe, welcoming, and alive while park planning moves forward.

    Will you help us take this step by making a gift today? Every donation matters. Whether it’s $100, $250, $500, $1,000 – or whatever feels right for you – your generosity will make a lasting difference. If you’d like to support this next chapter, you can make a secure online donation or mail a check to Sonoma Land Trust with “Southeast Greenway” in the memo line.

    Thank you for being part of this amazing journey, and for your continued support.